Aurora Solar

Project Details

Capabilities: Deep Foundations


Bolander was proud to be part of Geronimo Energy’s Aurora Solar project which installed new arrays around Minnesota.  The Hastings location covers 40 acres and is expected to generate 5 MW, enough to support over 1,000 homes.  Bolander provided drilling for a foundation piling system due to shallow rock that prevented typical pile driving.  After investigation of the variable soil conditions, Bolander worked with Biosar to develop a simple work plan reusing material already on-site.