Barge Terminal 1

Project Details

Capabilities: Earthwork | Deep Foundations


Bolander installed 1100 LF of barge dock wall for this rehabilitation project on the Mississippi River. Sheet pile was driven in front of an existing degraded concrete wall to extend the life of structure.  The top of the wall was capped with bent plate and cast-in-place concrete creating a safe new work area for longshoreman.   Bolander completed most of this work late winter, before shipping season, to ensure the St Paul Port Authority tenants would be minimally affected by these upgrades.