Central Corridor Light Rail – Civil East
Project Details
Capabilities: Deep Foundations | Demolition | Earth Retention | Earthwork | Environmental
This project was a great opportunity for Bolander to showcase nearly all of the disciplines that we perform. Our work consisted of:
- Demolition of the former Bremer Bank Building in downtown St Paul
- Building was 8 stories & 200,000 gsf
- Over 1.2 Million Square Feet of Pavement Removals
- 7 miles of historic street car track removal
- 165,000 Cubic Yards of Roadway Excavation & Export
- 95,000 Cubic Yards of Sand Section Importation and Placement
- Several Acres of Fine Grading and many miles of site wall footing excavation
- Structural Excavation and Backfill for LRT Stations
- Furnished and Placed Over 125,000 TONs of Roadway Base and Track Subballast
- Installation of 6 miles of roadway stormwater infiltration trenches
- PVC Membrane Liner
- Importation and placement of 19,500 TONs CU Structural Soil
- Over 100,000 TONs of Contaminated Soil Hauled and Landfill Disposed
- Installation of Driven Foundation Pipe Pile for Supported Track Section in Downtown St Paul
- Installation of 50,000 SF of Permanent Sheet Piling for TPSS Retaining Wall