Target Field Station

Project Details

Capabilities: Deep Foundations | Demolition | Design Build | Earth Retention | Earthwork | Environmental | Utilities


This project was a great opportunity for Bolander to showcase nearly all of the disciplines that we perform. Our work consisted of:

  • Building Demolition
  • Earthwork
  • 120,000 TNs of Soil Remediation
  • 400 Driven Foundation Pipe Pile
  • 10,000 SF Soil Nail and Shotcrete Retention Wall, Design-Build
  • 20,000 SF Steel Sheet Pile
  • Site Dewatering
  • Deep Foundation Caissons
  • 10,000 CY Geofoam System
  • Elevated Rainwater Cisterns
  • Underground stormwater retention system
  • Utilities
  • Structural Soil Tree/Permeable Paver Trenches