TH52 Frontage Road
Project Details
Capabilities: Design Build | Slope Stabilization
This MN/DOT project included the design & construction of a 3,000 SY Reinforced Soil Slope (RSS). The RSS consisted of over 200 grouted soil nail anchors, rock fall netting, cellular confinement webbing, premium topsoil and erosion control blanket. The project also included a roadway bridge, grading, underground utilities, paving & landscaping.